MGL Demolition was appointed to undertake full refurbishment works at a nuclear facility in Barrow-in-Furness. All work was undertaken in line with extensive security protocols.
Work undertaken within C10, a live operational building included:
- Installation of 200 linear metres of 16m high industrial screen to enclose the demolition working area.
- Notifiable licenced and non-notifiable removal of asbestos containing materials (ACMs).
- Soft strip and removal of M&E redundant equipment using multiple techniques including cold cutting and hot works.
- Temporary works.
- Remote demolition inside the building using a 20 tonne excavator, pulveriser and grab attachment.
- Coordinating and overseeing the removal of 4 overhead cranes. Due to access restraints one of the cranes was piecemealed free standing within the air (14m high) with a crash matt created below with 6F2 material.
Central Yard buildings C24 and C25 works included:
- 16 buildings, full remote demolition and removal of ACMs.
- Notifiable licenced and non-notifiable removal of ACMs with use of access and designed scaffold.
- Temporary works.
- Extensive and complex building separations with the use of cranes.
- Soft strip and M&E removal using multiple techniques including cold cutting and hot cutting.
- Full time use of 7-8 specialised demolition excavators ranging from 14 tonne to 90 tonne with 34m high reach.
- Removal of 9 overhead cranes and one 120 tonne overhead crane using a 300 tonne crane to remove.
- 26 week client programme achieved within 22 weeks.
Talk to the experts
about your project
We appreciate your interest in MGL Group. Contact us today and we’ll get back to you as quickly as we can.
You can stay up to date with the latest news by connecting with us on social media!
"*" indicates required fields